
Tire Shredder comma Tyre Recycling Tools 500kg solHour
1 interval One Hook DebeaEPTLSJ-1200
Structural attributes
The blade of cutter is manufactured of alloy welding and the area is challenging use-resisting time period
On safety issue comma this EPT have protecting frame comma which can properly ensure safety in the procedure of pulling out wire loop interval
Motor and EPT comma and as a EPT comma the framework is compact period
The EPT occupies the EPT flooring comma practical set up period
Use colon
Pulling out the wire loops from the mouth of waste tires period of time
two time period Tire Cutter QDJ-1200
The simple principle is colon motor drives hydraulic system and the cylinder comma location the tire to lock arm comma fasten two blades rotating in between tire and shear cylinders function to transfer comma two blades rotating blades forming shear comma attain the influence of shear period of time
Feature colon
This tools comma very good shear result comma shearing pace comma reduced vitality consumption comma small volume comma convenient comma due to the fact use the hydraulic technique comma effortless procedure and safe time period
Mechanical description colon the tires more than 800 need to have to reduce comma and cut into four pieces in EPT periodthe measurement of piece is 200-500mm interval
Notes for utilizing tire cutter colon
a period Inspect the knives often comma if show up evident blunt comma it need to be maintain timely comma and the support is two-3 a long time period
b period of time the oil in hydraulic station ought to be filtered and changed routinely interval EPTly filter when each and every 1 and fifty percent 12 months time period
c period of time Sporting areas colon rubber seals comma shipped with yet another established when ship the EPT to the purchaser time period
three amp4 time period EPT tire shredEPTZPS-900
Use colon
This EPT can right crush tires smaller than 800mm tires interval At the EPT temperature comma can be set straight crushed into 50 ast 50 mm block comma so the subsequent rotating can grind into ten-thirty meshes or wire and fiber separation equipment period of time
Function colon
This EPT is a compact structure comma superior engineering comma reduced vitality usage comma substantial effectiveness comma smashing off the test place for the construction comma servicing is specifically hassle-free semi tools with carbide surfacing engineering comma large hardness comma high dress in resistance comma and repeated mend using comma so has a EPTer provider daily life semi rotary display screen for the lattice construction of metal mesh comma blanking huge location comma enabling the screening of certified rubber interval Right after the partition of large tires can accomplish the effect of the same excl
Mechanical description colon the tires of 800mm diameter and rubber ring can directly be damaged into 50 ast50 mm of rubber block period of time
Notes for making use of EPT tire shredder colon
a time period Inject gear oil into EPT oil lparhypoid equipment oil rpar comma main bearings use calcium-based mostly grease lubrication comma 3 months soon after the operation of the EPT comma the oil ought to be changed and cleanse the fuel tank time period Because then adjust the oil as soon as time each and every calendar year time period
b After offer with 3 comma000 tons of waste rubber lparin typical conditions rpar commathe purchaser need to grind the blade cutting edge as soon as time interval The blades is the put on areas comma the EPT provider daily life is 5-six years comma when offering the EPT to the consumer comma the shredEPTwill be outfitted with edge hardness layer patching material lparelectrodes rpar interval
five time period Double Rolls Rubber Crusher XKP-560
Use colon
Mainly used for crack huge rubber blocks into forty-50mm modest rubber blocks period of time
Complex parameters colon
Framework colon The rollers undertake alloy chilly tough forged irons with put on-resisting comma durable characters period of time The mill flour is with teeth comma high groove time period
In orEPTto increase the support daily life of the cracker comma we suggest construct foundations for rubber cracker interval
The configurations of our XKP-560 rubber cracker are nylon bush grease lubrication and challenging equipment floor EPT with lower noise and EPTer support daily life interval
5Our crackers are created XiHu (West Lake) Dis.Hu (West Lake) Dis.nized with nice running platforms comma all the wires will be related effectively from managing program to motor time period When utilizing the EPT comma the consumers just require to hook up straight to the EPT period of time
Tire Shredder comma Tyre Recycling Gear
| No interval | Title | Design | Qty time period lparQty rpar |
Motor EPT lparKW rpar | ||
| one | One hook debeader | LSJ-1200 | 1 | eleven | ||
| two | EPT tyre cutter | QDJ-1200 | one | 5 period5 | ||
| three amp4 | EPT tyre shredder lparwith conveyor rpar |
ZPS-900 | one | 61 period5 | ||
| five | Double Rolls Rubber Crusher | XKP560 | one | 90 | ||
| six | Huge conveyor tools | BCL-eight | 1 | two | ||
| 7 | Tiny conveyor tools | BCL-three | 1 | one period1 | ||
| eight | Large Magnet separator | BMS22 | 1 | 2 period2 | ||
| 9 | Small Magnet separator | SMS-1 | 1 | 1 period1 | ||
| ten | Huge Shaking screen | BSS-8 | 1 | seven period5 | ||
| eleven | Modest Shaking display | SSS-3 | 1 | three | ||
| 12 | Fiber separator | FS110 | 1 | five period5 | ||
| 13 | Fine Rubber Powder Pulverizing EPT | XJFS-420 | four | 123 | ||
| Sq. vibrating sieve | 600 | 1 | ||||
| Rubber powder collector | JFS500 | 1 | seven period5 plus0 period75 equals8 period25 | |||
| Screw conveyer | Phi200mm | 1 | period75 | |||
| Screw conveyer | Phi132mm | 1 | period75 | |||
| Storage pin | one period5cbm | 1 | ||||
| Hopper | one | |||||
| Belt conveyer | 1 | period75 | ||||
| 14 | Metal Baller EPT | 30T | one | seven period5 | ||
| fifteen | Rubber powder EPT EPT | 1 | 3 | |||
| 24 | 334 period4KW | |||||
Tire Shredder comma Tyre Recycling Equipment

