
HangZhou Tiemeng Metal Structure Co.,Ltd is a expert company of Prefab Residence,Container Home and LigEPT Steel Composition and so forth.Our factory has handed SGS Factory Evaluation and ISO9001:2008 Good quality Certification.We are searching EPT to cooperating with you for EPT term organization romantic relationship.
Exporting Prefab Container Property
1.Definition: It is a kind of prefab home which is easy to transport.
The best and base are processed in manufacturing unit.
The export flat package stXiHu (West Lake) Dis.Hu (West Lake) Dis.rd room dimension:5900*2400*2910mm
two.Characteristic: A.It is plank body contructure.
B.Help save the transporation and storage room.
C.Manufacturing unit preassembly and rapidly set up.
D.This kind of composition has measures from leaking.
E.Using StXiHu (West Lake) Dis.Hu (West Lake) Dis.rdized and modularized creating so that they are straightforward to arrang and stack up.
F.Making use of glass wool sandwich panels so that they have numerous very good adventures such as:
fireproof,moistureproof,audio insulation,heat preservation.This style is suitable for residing.
G.Entire automatic powEPTcoating.The approach is inexperienced and air pollution-cost-free.
H.Beautiful Apperance and Envirenmental Defense
I.Fast and Simple Disassembly.Recurring Use.
three.Software: A.Street and Railway Construction Web site
B.Momentary Place of work/Venture Division
C.Short term Dormitory
D.Product sales Office
E.Medical Reception/Crisis Therapy
F.Limited-expression Civil Housing Development
G.the Army Camp
H.the Accomodation for Scientific Study.
four.Elements: A.Metal Construction Factors as below:
one) Column:210*a hundred and fifty*2.—3.
two) Top Ring Beam:a hundred and eighty*a hundred and five*two.-three.
three) Bottom Ring Beam:180*a hundred and five*two.-3.
four) Bottom Purlin:metal sq. tube one hundred*fifty
five) Top Purlin:C-type metal a hundred*40
B.The wall panel is a variety of composite board which is 50mm/75mm rock wool sandwich among two metal sheets.Its effective width is 950mm.
C.Doorway : 1950*930
D.Window: 1200*930
E.Ground: Concrete Slab and Plastic Board.
F.the Surface area of the Prime:Steel Tile
five.Manufacturing Method:
1) Acquiring Strip Steel
two) Pressing into Column ,Ring Beam and so on.
three) Body Welding
four) Surfacing Coating
5) Flooring Covering Installation
6) Thermal Insulating Layer Set up
seven) Electric powered Line Set up
eight) Ceiling Set up
nine) Steel Tile Installation
ten) Matching Wall Panels .Home windows and Doorways
eleven) Matching Connecting Factors
12) Transportation
six.Installation Process:
A. Making use of the Crane to Unload
B. Installating the Bottom
C. Installating the Column
D. Installating the Dowspout System.
E. Installating the Leading
F. Installating the Wall Panels
G. Installating the Windows and Doors
H. Installating the Electrical Line and Connecting Parts.
I. Modifying and Completing
FAQ:
Q: Are you a factory or trading company?
A:We are a factory who have more than ten many years experience on container houses’ manufacturing.
Q: What is the payment way?
A:T/T ,LC and so on.
Q: What is actually your offer capability?
A:Once-a-year Creation: container house 72000sets,prefab residence 564000square metersportable bathroom 24000sets
steel composition 360000square meters .
Q:How to put in ?
A:We will supply set up instruction and video for you, professionals will be sent to assist you if it is necessary. However, the visa payment,
air tickets, lodging,wages will be offered by customers.
Q: How EPT is your shipping time?
A:EPTly it is within10-30 daEPT,undoubtedly in accordance to quantity and colour.
Q: How do you assure the quality of the items?
A:Rigid item good quality manage,good quality helps make the potential.This is the tenet of our manufacturing unit.Every merchandise from
our factory has rigid testing techniques, and should be one hundred% qualitybefore supply.
Q: How canIget the quotation of the undertaking ?
A:If you have drawing ,we can offer you our quotation in accordance to your drawing .

